[Beowulf] Academic sites: who pays for the electricity?

Many of your questions may have already been answered in earlier discussions or in the FAQ. The search results page will indicate current discussions as well as past list serves, articles, and papers.

Search

Brent M. Clements bclem at rice.edu
Wed Feb 16 08:48:34 PST 2005


I would suggest asking this on the Educause CIO mailing list.

Anyone can join as long as your from a educational entity.

-Brent

> A/C are paid for by the school.  To do so they take "overhead"
> out of every grant.  Partially as a consequence of this they
> typically have a very poor ability to meter usage on a room
> by room basis.
>
> Now somewhere between the 10 node Pentium II beowulf sitting on
> a lab bench and the 1000 node dual P4 Xeon beowulf in a machine
> room that takes up half the basement the cost of the electricity
> (both for power and A/C) goes from  a minor expense to a major
> one.  Really major. For instance, in that hypothetical large machine,
> at 10 cents per kilowatt hour (a round number), assuming 100 watts
> per CPU (another round number) that's:
>
>  1000  (nodes) *
>     2  (cpus/node) *
>     .1 (kilowatts/cpu) *
>     .1 (dollars/kilowatt-hour) *
>  365   (days /year) *
>   24   (hours/day) =
> -----------------------
>  175200 dollars/year
>
> The A/C expense is going to vary tremendously depending upon
> the outside temperature.  It's going to be much higher for us
> in Southern California than for a site in Anchorage.
>
> "Typical" lab usage is widely variable but I'd be amazed
> if most biology or chemistry labs burn through even 1/10th this
> much for the equivalent lab area.  Some physics lab running
> a tokamak might come close.
>
>
> Anyway, the question is, have any of the universities said "enough
> is enough" and started charging these electricity costs directly?
> If so, what did they use for a cutover level, where usage was
> "above and beyond" overhead?
>
>> From an economic perspective having electricity and A/C come out
> of overhead (without limit) grossly distorts the true cost
> of the project over time and can lead to choices which increase
> the total overall cost. For instance, the use of Xeons instead of
> Opterons has little effect on TCO if somebody else is picking
> up the electricity tab, but could change the power consumption
> significantly on a large project.
>
> Regards,
>
> David Mathog
> mathog at caltech.edu
> Manager, Sequence Analysis Facility, Biology Division, Caltech
> _______________________________________________
> Beowulf mailing list, Beowulf at beowulf.org
> To change your subscription (digest mode or unsubscribe) visit http://www.beowulf.org/mailman/listinfo/beowulf
>