cooling
Many of your questions may have already been answered in earlier discussions or in the FAQ. The search results page will indicate current discussions as well as past list serves, articles, and papers.
Jon Mitchiner jon at minotaur.comTue Apr 23 19:32:47 PDT 2002
- Previous message: cooling
- Next message: cooling
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
The other consideration to have is some kind of monitoring/alerting system for the room. A client has a dedicated cooling equipment for a beowulf cluster for 52 machines. Recently the A/C broke one morning and they did not find out till the afternoon when someone walked into the small network room and found the room was in excess of 100 degrees. I dont want to think about what could have happened if it happened on a friday evening and nobody found about it until Monday. :) Jon Mitchiner ----- Original Message ----- From: "Bob Drzyzgula" <bob at drzyzgula.org> To: "Robert B Heckendorn" <heckendo at cs.uidaho.edu> Cc: <beowulf at beowulf.org> Sent: Tuesday, April 23, 2002 9:54 PM Subject: Re: cooling > If the new load requires the installation of new > chillers, it could indeed cost a pile-o'-money. Even > if each node burned electricity at 100 Watts, you > are looking at 50 kW of power consumption, or about > 170,000 BTU/hr, requiring about 14 tons of cooling to > remove -- your facilities folks may well be looking > at installing something like one or more Liebert > chillers such as these: > http://www.liebert.com/dynamic/displayproduct.asp?id=545&cycles=60Hz > > There could well be additional shortfalls in external > heat exchanger capacity, pipe capacity out to the > heat exchangers, electric power for the computers > and for the chillers, etc. If you don't already > have the raised floor space, that could also add > quite a bit to the cost to cool all those nodes. > > As to how we are making the A/C for our systems "affordable", > we do it by virtue of the HVAC budget belonging to > a different division, :-) although that also means > that we don't have *control* over that budget, and > when we hit the ceiling on cooling we kind of have > to just stop installing new equipment until the whining > and begging and pleading might eventually get us > a new chiller -- and even then we might have to give > up some rack space so there'd be a place to put it. :-( > > --Bob > > On Tue, Apr 23, 2002 at 05:41:35PM -0700, Robert B Heckendorn wrote: > > > > We are looking at the facilities issues in installing a beowulf on the > > order of 500 nodes. What facilities is telling us is that it is going > > to almost cost us more to buy the cooling for the machine than to buy > > machine itself. How are people making the air conditioning for their > > machines affordable? Have we miscalculated the HVAC loads? Are we > > being over charged? > > > > thanks for any guidance. > > > > -- > > | Robert Heckendorn | We may not be the only > > | heckendo at cs.uidaho.edu | species on the planet but > > | http://www.cs.uidaho.edu/~heckendo | we sure do act like it. > > | CS Dept, University of Idaho | > > | Moscow, Idaho, USA 83844-1010 | > > _______________________________________________ > > Beowulf mailing list, Beowulf at beowulf.org > > To change your subscription (digest mode or unsubscribe) visit http://www.beowulf.org/mailman/listinfo/beowulf > _______________________________________________ > Beowulf mailing list, Beowulf at beowulf.org > To change your subscription (digest mode or unsubscribe) visit http://www.beowulf.org/mailman/listinfo/beowulf >
- Previous message: cooling
- Next message: cooling
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
More information about the Beowulf mailing list