Heat pipes?
Many of your questions may have already been answered in earlier discussions or in the FAQ. The search results page will indicate current discussions as well as past list serves, articles, and papers.
Robert G. Brown rgb at phy.duke.eduTue Jun 5 07:42:19 PDT 2001
- Previous message: Heat pipes?
- Next message: Heat pipes?
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
On Mon, 4 Jun 2001, Patrick Lesher wrote: > On Mon, 4 Jun 2001, Eddie Lehman wrote: > > From: "Patrick Lesher" <pl25 at ibb.gatech.edu> > > > On Mon, 4 Jun 2001 alvin at Mail.Linux-Consulting.com wrote: > > > > On Mon, 21 May 2001, Donald B. Kinghorn wrote: One thing to remember in this whole discussion is that beowulfs and most sensibly designed clusters are supposed to be COTS entities. Rackmounting nodes is ok, as racks and cases are COTS components. Standard (mid, mini, whatever) towers and shelves are definitely ok and were the original beowulf paradigm, suitable when per-node cost of the marginal space difference isn't more expensive than the per-node cost of racks. However, when you start talking about handmade immersion cooling systems, custom chilled-water-cooled nodes, handmade liquid-cooled heatsinks, you're pushing the COTS boundary, unless you can find a source of units that can just be bought and attached in place of a regular heat sink/fan. You're arguably still within the beowulf paradigm on the very high-end (where you are emulating the design features of some of the various very expensive big-iron boxes of years past while still using COTS components as the primary basis of design) BUT you're also in a very narrow region of cost-benefit sanity. Consider the cost-benefit. The more handiwork you (or anybody else, e.g. the vendor) has to put into node assembly the higher the cost. A fair estimate of the retail value of the time is $100/hour for labor in the highly skilled labor marketplace, although of course you are welcome to discount your own/local opportunity cost labor to any value you choose. If the use of custom heat sinks costs as little as one hour of work per node (and the liquid cooling systems sound like they'd almost certainly cost more than one hour of labor each unless/until they can be purchased as COTS components and just stuck on the CPUs during a standard assembly process) then this adds $100 per CPU to your node cost in addition to the cost of the custom cooling component itself. If it is handmade (as a number of the proposed solutions in this thread were) the labor cost can double or quadruple to $200-400 per CPU with another $50-100 on top of that for the materials used to build the sinks and radiators. Let us conservatively assume an additional cost of $50 for the hardware and $100 (plus "an hour" of somebody's time) for the labor per node. Now, this methodology only makes sense at all for very high density, very high node count clusters -- 256 "hot" CPUs packed into 128 1U cases, for example (assuming that such a thing is physically possible with some liquid cooled design) -- or for overclockers. I'm religiously opposed to overclocking in a production cluster and will say no more of this. If you aren't overclocking and are only assembling 16 CPUs in 8-16 nodes, there are far simpler and cheaper COTS solutions, such as using decent size tower cases with an extra fan on shelves in a space with adequate air conditioning, which will save roughly $200/node in node cost anyway, or 2U or even (if necessary) 4U cases in a rackmount setup, also with an extra fan and/or a larger "normal" heatsink in a properly air conditioned space. Using a handmade chilled water liquid-cooled schema for 128 nodes at one hour of extra labor per node (if not per CPU, which might double it) would cost more than three work-weeks of labor. Three weeks of opening nodes, attaching the cooling components to the CPUs (carefully, since a bad job will be very difficult to repair later), sweatsoldering copper tubing and running it out the back of the nodes with suitable fittings, wrapping it in insulation inside the nodes to prevent condensation from forming and dripping onto your motherboard, and pressure testing the tubing before actually racking up the nodes. Just distributing the chilled water to all the nodes is a fairly significant problem in engineering and will be quite expensive. It also will leave you with a rackmounted setup where nodes are most definitely NOT going to be easy to replace, repair, or maintain. This >>might<< make sense for a really big "permanent" cluster for a big government or corporate research center, although I suspect that even for these clusters there are cheaper and more robust (and saner) alternatives. You've certainly gone a long way from the original beowulf off-the-shelf concept, and you will pay certain penalties for doing so -- node repair and replacement and upgrading the cluster all carry heavy cost-penalties beyond "just" the cost of the hardware and a bit of labor on a per-node basis. Your operation just doesn't scale as well, and this sort of handiwork only makes sense for clusters that will be in use for a long time (to justify the extra month or two it takes to build them). It also might make sense for a turnkey company to utilize a design like this for these customers and pre-solve the relevant engineering questions in such a way that they can build the nodes with economy of scale and robustness of design. And of course it is always reasonable for the "hobbyist" cluster even on a small scale -- if it gives you joy to build liquid cooling systems for your computer cluster, then by all means do so. I personally would rather have the extra node or two a heavily customized cooling system would cost and would rather save the time, even as a hobbyist. Sticking an extra fan into each node is relatively cheap, and moving cooled air around to pump into the nodes' chassis via that fan is standard technology. Air may not be the most efficient cooling medium available, but it is plentiful and cheap and in many cases (sorry;-) is good enough. Ultimately, it pays to remember what you are really buying with all this effort and money. That is >>perhaps<< a year's relative speed advantage for your cluster. I have these lovely 18 month old dual 400 MHz PIII's with heat sinks the size of a small toaster (occupied volume of 250-500 cc's) and extra cooling fans. Then I have eight month old 800 MHz Athlons with heat sinks that are pretty "normal" in size (occupied volume of 50-100 cc's), and one month old 1.33 GHz Athlons ditto. The way Moore's Law works, one could literally spend 2-3 months engineering a custom cooling systems for the processor du jour in an immensely packed configuration only to be confronted, three months into the use of the cluster, with 30% faster processors available that actually consume less power that fit into the same standard cases with no problem. rgb -- Robert G. Brown http://www.phy.duke.edu/~rgb/ Duke University Dept. of Physics, Box 90305 Durham, N.C. 27708-0305 Phone: 1-919-660-2567 Fax: 919-660-2525 email:rgb at phy.duke.edu
- Previous message: Heat pipes?
- Next message: Heat pipes?
- Messages sorted by: [ date ] [ thread ] [ subject ] [ author ]
More information about the Beowulf mailing list